| Sign In | Join Free | My wneducation.com |
|
| Brand Name: YUHONG | Certification: ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2008 |
| Model Number: L Type Fin Tube,Tension Wound,Studded | Minimum Order Quantity: 100kgs |
| Delivery Time: 7days | Payment Terms: L/C, T/T |
| Yuhong Group Co.,Ltd [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: Ecool | Certification: ISO9001 |
| Model Number: EHX09 | Minimum Order Quantity: 1 set |
| Delivery Time: 2-3 weeks | Payment Terms: T/T |
| ECOOL INTERNATIONAL TRADING (Shanghai) Co., Ltd. [Shanghai,China] | |
| Active Member | |
| Brand Name: HD Boiler | Certification: ASME, ISO |
| Model Number: H / Spiral TYPE | Minimum Order Quantity: 3 TONS |
| Delivery Time: Depands on Qty | Payment Terms: 30% after contract and balance 70% before shipment, or 100% L/C at sight |
| Zhangjiagang HuaDong Boiler Co., Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: Reliance | Certification: CE,ISO... |
| Model Number: DR | Minimum Order Quantity: N/A |
| Delivery Time: Ex-work within 1 month on receipt of order. | Payment Terms: T/T, L/C |
| JIANGSU RELIANCE THERMAL EQUIPMENT CO., LTD [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: DELLOK Yonghui | Certification: ISO9001 |
| Model Number: Low Fin Tube | Minimum Order Quantity: 1 meter |
| Delivery Time: 1-3weeks | Payment Terms: T/T, L/C, D/A, D/P, Western Union, MoneyGram |
| Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd. [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: HDT | Certification: ISO9001,ASME,Grade A,SGS,EN,TUV |
| Model Number: Boiler Fin Tube | Minimum Order Quantity: 5T |
| Delivery Time: 60-75days | Payment Terms: L/C, T/T, Western Union |
| ZHANGJIAGANG HUA DONG ENERGY TECHNOLOGY CO.,LTD [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: HZFT | Certification: ISO9001:2008 |
| Model Number: M-11035.166080-01 | Minimum Order Quantity: 1 Pcs |
| Delivery Time: 1 - 30 Days | Payment Terms: L/C , T/T |
| Hangzhou Fin Tube Co., Ltd. [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: Torich | Certification: ISO 9001 |
| Model Number: Fin tubes | Minimum Order Quantity: 5 tons |
| Delivery Time: 60-100days | Payment Terms: L/C, T/T |
| Torich International Limited [Zhejiang,China] | |
| Site Member | |
| Brand Name: Yuhong | Certification: ABS, BV, DNV, CCS, LR |
| Model Number: Serrated Finned Tubes | Minimum Order Quantity: Depend the size of finned tubes |
| Delivery Time: 35-60 days | Payment Terms: TT, LC |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: Joyruns | Certification: ISO9001 |
| Model Number: 19.05*2.11 | Minimum Order Quantity: 2Tons |
| Delivery Time: 30days | Payment Terms: L/C, T/T |
| Changzhou Joyruns Steel Tube CO.,LTD [China] | |
| Verified Supplier | |
| Brand Name: SAT-CHAM | Certification: ISO CE |
| Model Number: Boiler H-fin tube | Minimum Order Quantity: 1 Set |
| Delivery Time: 30 Days | Payment Terms: L/C, T/T, Western Union |
| Jiangsu Sat-Cham Energy Technology Co., Ltd. [China] | |
| Verified Supplier | |
| Brand Name: YUHONG | Certification: ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2015 |
| Model Number: Serrated Finned Tubes | Minimum Order Quantity: Depend the size of finned tubes |
| Delivery Time: 35-60 days | Payment Terms: L/C, T/T |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Active Member | |
| Brand Name: FRANK STEEL | Certification: DNV / LR / BV |
| Model Number: Negotiation | Minimum Order Quantity: 1 Tons or negotiation |
| Delivery Time: about 30 work days | Payment Terms: T/T |
| SUZHOU FRANK STEEL CO.,LTD. [Jiangsu,China] | |
| Active Member | |
| Brand Name: Transense | Certification: Rohs;ISO9001;ISO14001;ISO45001; |
| Model Number: CU-DHP | Minimum Order Quantity: 1 ton |
| Delivery Time: 3-4 weeks | Payment Terms: L/C, D/A, D/P, T/T |
| transense copper [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: HDB Boiler Economizer | Certification: ISO9001,ASME, EN,TUV |
| Minimum Order Quantity: 25 tons | Place of Origin: Zhangjiagang,China |
| Price: $3,400-3,500 / ton | Type: Natural Circulation |
| SuZhou Saneco boiler co.ltd [Jiangsu,China] | |
| Verified Supplier | |
| Brand Name: Dehai Boiler | Certification: ISO9001 , SGS , ABS , ASME |
| Model Number: Economizer | Minimum Order Quantity: 10 Tons |
| Delivery Time: 45 Days | Payment Terms: L/C, T/T |
| Zhangjiagang Dehai Boiler Co., Ltd [China] | |
| Verified Supplier | |
| Brand Name: TORICH | Certification: API,CE,ISO,ISO9001-2008,ISO9001 |
| Model Number: Embedded Fin Tube | Minimum Order Quantity: 1Ton |
| Delivery Time: 20-30days upon products | Payment Terms: L/C,D/A,D/P,T/T,Western Union,MoneyGram |
| TORICH INTERNATIONAL LIMITED [Zhejiang,China] | |
| Verified Supplier | |
| Brand Name: YuHong | Certification: ABS, BV, ISO, ASTM, SGS |
| Model Number: Embedded Finned Tubes ASTM 179 with Al1060 Fins | Minimum Order Quantity: 200~500 KGS |
| Delivery Time: 35-60 Days (Depend on Customer's Requirements) | Payment Terms: T/T,L/C AT SIGHT |
| YUHONG HOLDING GROUP CO., LTD [China] | |
| Verified Supplier | |
| Brand Name: TORICH | Certification: ISO9001, ISO14001, TS16949 |
| Model Number: Stainless Steel G-Type Embedded Finned Tube | Minimum Order Quantity: 1 Tons |
| Delivery Time: 20-30days upon products | Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| TORICH INTERNATIONAL LIMITED [Zhejiang,China] | |
| Verified Supplier | |