Sign In | Join Free | My wneducation.com |
|
Categories | Geotube Dewatering Bags |
---|---|
Brand Name: | OEM |
Certification: | ISO9001 |
Place of Origin: | China |
MOQ: | 10pcs |
Price: | US $0.30-2.00 / Square Meter |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 20000 Square Maters/ Day |
Delivery Time: | 7-12 working days |
Packaging Details: | Packed in PP Woven Bag or according to customers requirements |
Application: | Reinforcement, Filtration, etc |
Length: | 50m-100m/Roll |
Color: | Black |
Product Name: | Woven Geotextile Tube Dewatering Bag |
Width: | 2m-6m |
Weight: | 100g-1000g/Sqm |
Company Info. |
Anhui Zhonglu Engineering Materials Co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
1.Geotextile Tube is manufactured from woven high tenacity
polypropylene multifilament yarns, which are woven into a stable
network such that the yarns retain their relative position.
2.It is inert to biological degradation and resistant to naturally
encountered chemicals, alkalis and acids, etc.
3.Geotextile tube has different strength and permeability, and have
high UV resistance, seawater resistance, microbial erosion
resistance and other durability.
Advantage:
1. Resistant to moisture.
2. Chemical resistance.
3. Anti-biodegradation and animal destruction.
4. High temperature resistance.
5. UV resistance.
Technical Data Sheet | |||||
Item | Unit | Testing Standard | Technical Parameters | ||
GT70X95B | GT70X95 | ||||
Breaking strength | MD | KN/m | ISO 10319-2015 | 85 | 85 |
CD | KN/m | ISO 10319-2015 | 105 | 115 | |
Elongation of break | MD | % | ISO 10319-2015 | 13 | 13 |
CD | % | ISO 10319-2015 | 8 | 8 | |
Sewing Tensile Strength | KN/m | ISO 10321-2008 | 70 | 90 | |
Static Bursting Strength(CBR) | KN | GB/T 14800-2010 | 8 | 9 | |
Equivalent hole size(O90) | mm | GB/T 14799-2005 | 0.5 | 0.45 | |
Permeability(Q50) | L/m2/s | GB/T 15789-2005 | 50 | 35 | |
UV-resistance (500 Hours strength retention) | % | ASTMD4355-2014 | 90 | 90 |
Compared with the traditional direct stacking method in the mud dump, geotube has the following advantages:
1. Economical, no large-scale equipment and factory investment is required, and only a small number of non-professional operators are needed; the sludge dehydration part does not require electricity, and has the advantages of energy saving and emission reduction.
2. Convenience, the diameter and length of the geotube can be adjusted as needed. It has strong plasticity, is stackable, and is easy to transport.
3. Environmentally friendly, fully enclosed construction, almost no noise, and less likely to cause secondary pollution.
4. High efficiency, it can fully meet the processing capacity of wastewater and sludge. The processing capacity can increase or decrease the number of pipe bags according to the flow rate of the pump.
5. The volume reduction effect is good. The sludge volume can basically be reduced by more than 90% within a month, making subsequent removal and treatme
Every geotextile tube project is unique. As such, general
guidelines can be described, but each project requires consultation
with a geotextile tube expert to identify the project's singular
attributes and to design the sludge dewatering process accordingly.
It is of utmost importance to place the geotextile tube on a level
ground and before deploying, any barriers ,such as stone ,sundry ,
have to be removed as to prevent them from influencing the
deploying effect. After the geotextile tube delivered to the site,
secure it on ground with external steel pipe or timber pile to fix
the position of geotube. Prepare the feeding equipment in advance,
like cutter head and suction dredge (for dredged materials), feed
pump (for sludge materials),which are to be used in the following
operations.
Geotextile tube have a "shirt-sleeve" style filling port. Simply
place the pump hose into the port and secure it with a hose clamp,
tie-wire or duct tape. Once the pumping begins, clear, effluent
water will drain from the tube through the small openings in the
permeable geotextile fabric. Meanwhile, the sludge dewatering tube
bottom will develop a filter cake quickly, so the water will decant
mainly out of the sides and top of the tube gradually.
After a long-time cycle of repeated cycles of filling and
dewatering, over 99% of solids are captured. Typically, the
decanted water can be returned to waterways without additional
treatment. If any erosion caused around the tube, deploy the sump
pumps at the all four corners of the area to collect the effluent.
Notes:
1- During pumping, the elevation or height of the tube needs to be
monitored to prevent ruptures. Typically, keep the height to be 80%
is more a optimum.
2- The sands gathered the most at the entrance of port , so adjust
the sand concentration at the proper time to assure the sands
depositing smoothly.
3- To fill the tube to its required height, the designed height
should be equal or greater than the half of the diameter of
geotextile tube.
4- The sand concentration of the dewatered material shoul.
![]() |